Perm. TGC-9 summed up the production activity results in May, 2007.
During this period the power stations generated 1,2 milliard kW/h of electricity, that makes 107% of the monthly production plan. Perm Territory TGC-9 Branches output 493,9 mln kW/h of eletricity or 101% of the volume planned, in Sverdlovsk Region - 497,3 kW/h that exceeds the plan by 18%, in the Republic of Komi - 225,3 mln kW/h that meets the production plan.
In may TGC-9 Branches generated 2,6 mln Gkall of heat energy that exceeds the monthly plan by 13%. Perm Territory power plants and boiler of the Company generated 918,6 Gkall of heat, thus exceeding the production plans by 30%, in Sverdlovsk Region - 1,3 mln Gkall that makes 111,7 5 of the plan, in the Republic of Komi - 423, 9 thousand Gkall, that is a little behind the volumes planned.
|