print version 

Find company
Home About the ProjectContact usFor the Clients
Enter code or ISIN
 
alpha / industry search

Issuers' Corner
Press Releases
Annual Reports Library

Financial Statements
SEC & FFMS Filings
Corporate Presentations
GM Materials
Issues Documents
Corporate Governance Materials
Russian Company Guide
Company Profiles
Corporate Calendar
Markets Corner
Consensus Estimates
Media Corner
News Line


Get updates



Home  Issuers' Corner  Press Releases REGISTER LOG IN

Press Releases

company search
all press releases
all TGC-9 press releases

TGC-9

July 3, 2007

TGC-9 started realization of the project of provision of regular heat supply of Berezniki under the conditions of technical accident in potash mine

In connection with the fact that Bereznikovskaya HPP-10 is located in the area of possible hole in the surface, TGC-9 will prepare the equipment of HPP-4 for bearing of increased loads and set in operation a new heat main.

As a result of the accident in the mine in Berezniki appearing of a hole in the surface is possible. The equipment and communications of Bereznikovskaya HPP-10 are also in the risk area. This HPP is one of three generating stations of TGC-9, located in Berezniki, it provides energy supply of the Western part of the city with the population of about 40 thousand people. Two other stations of TGC-9 – HPP-2 and HPP-4 – are located in the secure area.

To guarantee reliable heat supply of Berezniki in case of inability of continuation of full work of HPP-10, TGC-9 plans to organize the supply of heat energy to citizens and enterprises of the city from Bereznikovskaya HPP-4. For that the company plans by December 1st, 2007 to build a new line of main heat networks 3,5 km long that will connect HPP-4 with the system of district heating of Berezniki. Works on this project are already being executed. Besides, the equipment of Bereznikovskaya HPP-4 is being additionally prepared for bearing of the increased load in winter period. The preliminary cost of works on construction of a new heat main and preparation of the equipment of HPP-4 is 360 million RUR.

In autumn of the year 2006, when the accident in potash mine happened TGC-9 took operative measures on provision of reliability of heat supply of Berezniki. In the shortest possible time – during a week – they transferred the gas conduit that provided Bereznikovskaya HPP-4 with fuel from the risk area of the possible hole in the surface. Besides, the station prepared maximum store of the reserve fuel for steady work of HPP in autumn-winter period of the years 2006-2007 and in future. The cost of gas conduit transfer in the year 2006 was approximately 26 million RUR.

 

 

 

Search by industry

Agriculture, Foresty and Fishing | Chemicals | Engineering | Ferrous Metals | Financial, Insurance & Real Estate | Food & Kindred Products | General Construction | Information Technology | Media & Publishing | Non-Ferrous Metals | Oil & Gas | Pharmaceuticals | Power Industry | Precious Metals and Diamonds | Telecommunications | Transportation | Wholesale & Retail Trade

Search by alpha index

A B C D F G H I K L M N O P R S T U V W X Z


Site Map
© RUSTOCKS.com
Privacy Statement | Disclaimer