print version 

Find company
Home About the ProjectContact usFor the Clients
Enter code or ISIN
 
alpha / industry search

Issuers' Corner
Press Releases
Annual Reports Library

Financial Statements
SEC & FFMS Filings
Corporate Presentations
GM Materials
Issues Documents
Corporate Governance Materials
Russian Company Guide
Company Profiles
Corporate Calendar
Markets Corner
Consensus Estimates
Media Corner
News Line


Get updates



Home  Issuers' Corner  Press Releases  Oil Company "LUKOIL" REGISTER LOG IN

Press Releases > Oil Company "LUKOIL"  all about the company

company search
all press releases
all Oil Company "LUKOIL" press releases

Oil Company "LUKOIL"

January 31, 2018

LUKOIL commissioned first production well at the phase 2 of Filanovsky field

LUKOIL has completed the construction and commissioning of the first well at the Phase 2 of Vladimir Filanovsky field in the Caspian Sea.

​This is a production single bore horizontal well with the measured depth of 3.5 kilometers. The horizontal section of the well is 1.2 kilometers. The initial well flow reached 2.4 thousand tonnes of oil per day. As a result, the daily oil production at the field increased to 16.8 thousand tonnes. 

As of today, the Company started to drill an injection well. Further execution of the drilling program at the Phase 2 of the field's development will allow to stabilize production at the designed plateau of 6 million tonnes on an annualized basis. 

INFORMATION

Vladimir Filanovsky field was put into operation in the Russian sector of the Caspian Sea in 2016. Its initial recoverable reserves amount to 129 million tonnes of oil and 30 billion cubic meters of gas.
The field is being developed in the three phases.
Phase 1 facilities were commissioned in 2016 and include a fixed ice resistant platform, an accommodation block platform, a riser block and a central processing platform. Eight wells were drilled at the Phase 1 (6 production and 2 injection wells).
Phase 2 facilities include a fixed ice resistant platform and an accommodation block platform.
The construction of the wellhead platform, field's Phase 3 development, started in 2017.
All of the offshore facilities installed at LUKOIL's Caspian Sea fields were manufactured by the Russian shipyards. 

CONTACT INFORMATION

Press Centre PJSC "LUKOIL"

media@lukoil.com

+7 (495) 627-16-77

https://www.lukoil.com

https://www.facebook.com/Lukoil.en

https://twitter.com/lukoilengl

 

 

 

Search by industry

Agriculture, Foresty and Fishing | Chemicals | Engineering | Ferrous Metals | Financial, Insurance & Real Estate | Food & Kindred Products | General Construction | Information Technology | Media & Publishing | Non-Ferrous Metals | Oil & Gas | Pharmaceuticals | Power Industry | Precious Metals and Diamonds | Telecommunications | Transportation | Wholesale & Retail Trade

Search by alpha index

A B C D F G H I K L M N O P R S T U V W X Z


Site Map
© RUSTOCKS.com
Privacy Statement | Disclaimer