The repair program is fully executed by physical parameters.
IDGC of North-West, JSC has fully executed the repair program of the 1st half year of 2010 by physical parameters, as to positions – with overfulfilment of the plan. The expenses for execution of repair works have amounted to RUR 458,1 mln.
Within the first six months of 2010 the branches of IDGC of North-West repaired 594 km of overhead lines with the voltage of 35-150 kv and also 2109 km of power transmission lines with the voltage of 0,4-20 kv.
The capital repair of 12 transformers and 185 switchers of voltage 35-150 kv is made in seven regions in the servicing territory of IDGC of North-West.
In terms of preparation to passing of the autumn and winter period 2052 ha of 35-150 kv routes and 1910 ha of 0,4-20 kv routes are cleared, the repair of 508 transformer substations is made.
|